DREAMLAND INTERIORS
  • HOME
  • ABOUT US
    • WHO WE ARE
    • WHAT WE DO
    • PRINCIPAL
    • NATALIE’S FUN FACTS
    • Blog
    • PUBLICATIONS
  • HOME STAGING
    • Druid Hills
    • Bardmoor Place
    • Trinity
    • Lambright
    • Mango Bay
    • Maid Marion
    • Cherrywood
    • Curt Street
    • Virtual Home Staging
    • Home Staging Services
  • PORTFOLIO
    • HOODS, TILE & CEILINGS
    • COMMERCIAL GALLERY
    • HUTCHES, WALL UNITS & ISLANDS
    • BATHROOM GALLERY
    • KITCHEN GALLERY
    • INTERIOR DESIGN
    • NEW CONSTRUCTION >
      • Stein Residence
      • Casey Residence
      • Dana Residence
  • DESIGN SERVICES
    • PROGRAMMING
    • DESIGN DEVELOPMENT
    • SCHEMATIC DESIGN
    • CONTRACT DOCUMENTS & BIDDING
    • CONTRACT ADMINISTRATION
    • PURCHASING & SHOPPING
    • SHOP DRAWINGS
  • CONTACT US
    • Business Partners
    • Additional Business Partners
    • Vendor List
    • Helpful Information

Dreamland Interiors Blog

Tips for the Homeowner When Remodeling

1/9/2018

0 Comments

 

See to these matters before hiring a contractor:
1. The contract itself. A contract protects the parties involved. Just because you had a great conversation during the first meeting at the house, and even though the work is only supposed to take two days, you'll regret not having a contract when one of you forgets half of that great conversation and the work isn't completed after two weeks.

2. A physical address. Should you need to track down your contractor after work has begun, you won't find him or her at a P.O. box. Ask to drop off the deposit at the physical location listed on the contract.

3. License. While in some cities getting a contractor's license may be more a matter of writing a check than verifying skill, check to see that your contractor lists a license required for the work being done. A license may mean that your contractor passed the required exams, or it may just mean the state knows where to find him to collect taxes. But it also means your contractor has done the paperwork and is playing by the rules.

4. Insurance. Injuries can occur on a construction site. If the location is your home and your contractor does not have the proper insurance, you may be held liable. Check with your locality for the proper amount of liability insurance, and if the contractor has employees, check to see whether he carries worker's compensation insurance.

5. Scope of work. There are many details to get right in a renovation, so write everything down before work begins. This can be the best way to get everyone on the same page. If your designer has drawn up detailed plans, make sure the contract references the designer and the date on the plans so you have something to point to should the finish on your woodwork be different from what you requested.

6. Duration of work. Though projects often take longer than predicted for many legitimate reasons — some caused by the client and some outside the contractor's control — put the expected project duration in writing. The important thing is not that your contractor shows up every day, but that he finishes the project on time. Having a timeline will help calm your nerves if progress hits a slow spot.

7. Exclusions. A good contract should include a list of exclusions. These might be related to areas that will not be visible until the walls are opened up after demolition, or the level of cleaning you should expect after the work is complete. Also, talk to your contractor about the likelihood of finding asbestos behind the walls. He won't be able to say for sure, but he can speak from experience and help you plan your contingency budget.

8. EPA lead safety certification. Contractors working on homes in the U.S. built before 1978 should be certified in lead-safe practices by the EPA. You can read more about the requirements here, but in a nutshell, it's all about minimizing and containing dust during work, which is vital for the safety of you and your family.

9. Payment schedule. While payment schedules can vary by the job, they should always be agreeable to both parties involved. In my opinion, payments tied to milestones in the project are better than those tied to percentages of completion. As long as you are confident that you're not paying for significantly more than what's been completed, you should be OK.

10. Warranty. The standard warranty for work is one year from substantial completion. If you've checked the contractor's physical address and gotten recommendations from people you trust, you'll know where to find him later if needed.

​Kenny Grono September 21, 2012
0 Comments



Leave a Reply.

    Natalie A. Gauci

    Licensed Interior Designer working in the Tampa Bay, Florida area.

    Archives

    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017

    Categories

    All
    Appliances
    Art
    Bathrooms
    Bedroom
    Cabinet Hardware
    Cabinetry
    Dining Room
    DIY Projects
    Doors And Windows
    Electrical
    Fans
    Finishing Touches & Moldings
    Floors
    Furniture
    HVAC
    Kitchen Ideas / Projects
    Lighting
    Miscellaneous
    Office
    Outdoor Living
    Paint
    Playrooms-kids-spaces
    Plumbing
    Remodel
    Rugs
    Seasonal
    Smart-home-products
    Storage
    Tile-and-stone
    Trends
    Window Treatments

    RSS Feed

DREAMLAND INTERIORS LOGO
#stagingthedream

Dreamland Interiors...
where all your decorating dreams come true

​3935 East Eden Roc Circle Tampa, FL  33634
813-841-5451
Selection Studio
24010 FL-54
Lutz, Florida 33559

    Contact Us

Submit


​Membership


SHERWIN WILLIAMS ADVISORY BOARD

Picture
© Dreamland Interiors, Inc.  2023
  • HOME
  • ABOUT US
    • WHO WE ARE
    • WHAT WE DO
    • PRINCIPAL
    • NATALIE’S FUN FACTS
    • Blog
    • PUBLICATIONS
  • HOME STAGING
    • Druid Hills
    • Bardmoor Place
    • Trinity
    • Lambright
    • Mango Bay
    • Maid Marion
    • Cherrywood
    • Curt Street
    • Virtual Home Staging
    • Home Staging Services
  • PORTFOLIO
    • HOODS, TILE & CEILINGS
    • COMMERCIAL GALLERY
    • HUTCHES, WALL UNITS & ISLANDS
    • BATHROOM GALLERY
    • KITCHEN GALLERY
    • INTERIOR DESIGN
    • NEW CONSTRUCTION >
      • Stein Residence
      • Casey Residence
      • Dana Residence
  • DESIGN SERVICES
    • PROGRAMMING
    • DESIGN DEVELOPMENT
    • SCHEMATIC DESIGN
    • CONTRACT DOCUMENTS & BIDDING
    • CONTRACT ADMINISTRATION
    • PURCHASING & SHOPPING
    • SHOP DRAWINGS
  • CONTACT US
    • Business Partners
    • Additional Business Partners
    • Vendor List
    • Helpful Information